The Tapwell EVO EVM072 is a sleek single-lever basin mixer crafted from high-quality brass with a brilliant chrome finish and an intuitive joystick handle.
The Tapwell EVO EVM072 basin mixer combines modern aesthetics with precise functionality. Defined by its minimalist silhouette and clean lines, this single-lever tap serves as an elegant focal point in any contemporary bathroom setting.
Engineered with a responsive joystick handle, the mixer enables smooth and effortless control over both water flow and temperature. The fixed spout features a projection of 114 mm, delivering comfortable clearance and balanced water flow for everyday washing tasks.
Manufactured in Italy from solid brass, the EVM072 represents the pinnacle of European technical precision and enduring craftsmanship. The lustrous polished chrome finish provides superior corrosion resistance while maintaining an enduring, reflective shine that complements modern bathroom fixtures.
Designed to meet rigorous Nordic plumbing standards, the mixer connects via Ø10 mm water inlet lines and requires a standard 45 mm mounting hole. It is delivered without a pop-up waste valve, allowing complete flexibility to pair with universal push or mechanical waste systems.
- Product Type: Basin Mixer
- Series: EVO
- Control: Single-lever joystick
- Finish: Chrome
- Material: Brass
- Height: 155 mm
- Spout Projection: 114 mm
- Depth: 143 mm
- Width: 45 mm
- Hole Size: 45 mm
- Water Connection: Ø10 mm
- Swivel Spout: No
- Waste Valve: Not included
The Tapwell EVO EVM072 is a sleek single-lever basin mixer crafted from high-quality brass with a brilliant chrome finish and an intuitive joystick handle.
The Tapwell EVO EVM072 basin mixer combines modern aesthetics with precise functionality. Defined by its minimalist silhouette and clean lines, this single-lever tap serves as an elegant focal point in any contemporary bathroom setting.
Engineered with a responsive joystick handle, the mixer enables smooth and effortless control over both water flow and temperature. The fixed spout features a projection of 114 mm, delivering comfortable clearance and balanced water flow for everyday washing tasks.
Manufactured in Italy from solid brass, the EVM072 represents the pinnacle of European technical precision and enduring craftsmanship. The lustrous polished chrome finish provides superior corrosion resistance while maintaining an enduring, reflective shine that complements modern bathroom fixtures.
Designed to meet rigorous Nordic plumbing standards, the mixer connects via Ø10 mm water inlet lines and requires a standard 45 mm mounting hole. It is delivered without a pop-up waste valve, allowing complete flexibility to pair with universal push or mechanical waste systems.
- Product Type: Basin Mixer
- Series: EVO
- Control: Single-lever joystick
- Finish: Chrome
- Material: Brass
- Height: 155 mm
- Spout Projection: 114 mm
- Depth: 143 mm
- Width: 45 mm
- Hole Size: 45 mm
- Water Connection: Ø10 mm
- Swivel Spout: No
- Waste Valve: Not included
Tapwell EVO EVM072 Basin Mixer, Chrome
- Ordinær pris
- €269,90
- Salgspris
- €269,90
- Ordinær pris
-
€359,46
Sjekk ut disse relaterte produktene
FAQ
Har produktene garanti?
Hvor kommer produktene dere selger fra?
Produktene våre er i de fleste tilfeller kvalitetskontrollerte kundereturer fra våre partnerforhandlere og merkevarer. Brukte produkter er tydelig merket og er enten betjente produkter fra våre partnerforhandlere eller kvalitetskontrollerte produkter kjøpt direkte fra forbrukere.
Kan jeg hente bestillingen min et sted (klikk og hent)?
Vi sender produktene enten fra lokale lager eller fra vårt sentrallager i Finland, og vi prøver alltid å finne den laveste CO2-ruten til kundene. Derfor har vi ikke et alternativ for klikk og hent.
Condition grade information
We determine the condition category based on user feedback and product-specific inspection. When the product is inspected, we may add missing parts or otherwise improve the product as needed.
New
The product is new and the product package has not been opened before.
A - As New
Product is comparable to a new product, but product package has been opened. No signs of wear or defect. Comes with the original box with all items in the box.
B - Very Good
Product is in Very Good condition, has little or no signs of wear but may have been tried by a previous customer. All major items are in the box but there may be some minor damage in the product packaging.
C - Minor Wear
Product may have minor signs of wear. Item is functional and fully works as intended. Some components may be missing or the original product packaging may be damaged or missing.
C - By Partner
Product in good condition but may have minor signs of wear. Item is fully functional and works as intended. Some minor original components may be missing and the original product packaging may be missing. This is a dropshipped product by one of our partners.
Pre-Owned
Pre-owned products are either serviced products from our partner retailers or quality checked products acquired directly from consumers. Product grading (A-D) also applies to pre-owned products.